Job cost that agrees with the ledger, because it reads the same postings.

Every transaction carries job, phase and cost code from the day it posts. Budget vs actual, commitments, job cost detail and the WIP schedule read from the same figures, so the project manager and the controller look at one number. Jobs and cost codes stay matched with the ERP you run today.

A worker with a tablet on a job site, a crane and crew behind
JOB COST / 10.26 COST ON THE JOB

What you can do with job cost.

01

Code it once, at the source

A bill, a receipt, an approved timesheet or a journal entry carries job, phase and cost code when it posts. There is no second job cost ledger to reconcile to the general ledger at month end, because the dimensional ledger is both. Costs roll up from cost code to phase to job to company.

02

See budget, committed and actual on one line

Budget vs actual shows each cost code with what has posted, what is committed on open purchase orders and subcontracts, and what is left. Drill from the line to the transactions behind it. A cost code that is heading over budget shows it before the next bill arrives, not after the period has closed.

03

Start every job from a template

Cost code templates set up a new job's cost code list in one step, so every job is coded the same way and reports compare across jobs. Projects carry their budget, commitments and cost to date, and job cost detail lists every transaction behind the totals, by cost code.

04

Run WIP from the same numbers

The WIP schedule works each job's percent complete and earned revenue from cost to date and the estimate at completion, and shows over or under billing against what has been billed. It reads the same job cost as everything else, so there is no spreadsheet to rebuild at quarter end.

The WIP schedule, live from job cost and billings
Every job with its cost to date and percent complete

What is in the job cost module.

Projects
Each job with its budget, commitments, cost to date and billings, coded by phase and cost code.
Cost code templates
Standard cost code lists applied to a new job in one step.
Dimensional ledger
Every transaction carries job, phase and cost code, or fund and program.
Budget vs actual
Budget, committed and actual by cost code, with drill-down to the transactions.
Commitments
Open purchase orders and subcontracts counted as committed cost against the budget.
Job cost detail
Every posted transaction behind a job's totals, by cost code.
WIP schedule
Percent complete, earned revenue and over or under billing for every job.
Inventory and catalog
Warehouses, stock levels, receipts, issues, transfers and adjustments, with items, rate cards and equipment, sit beside job cost in the same module.

Job cost for every company on the project.

The same module, used by the owner, the general contractor and the subcontractor. One example each.

For owners

Budget vs actual by project and funding source

An owner tracks each capital project against its budget by funding source as well as cost code. Commitments show what is under contract but not yet billed, and the budget vs actual line says what is left before the next draw request goes out.

For general contractors

One job cost for the PM and the controller

A GC's project manager and controller read the same job cost detail, with subcontract commitments, the bills posted against them, labor from approved timesheets and the WIP position. Over or under billing shows per job without a month-end spreadsheet.

For subcontractors and suppliers

Cost codes that match the estimate

A sub sets each job up from a cost code template that mirrors the estimate. Supplier bills and payroll land on those codes, so budget vs actual compares to the bid line by line and the WIP schedule is ready at quarter end.

In step with the ERP you run today.

Jobs and cost codes match on both sides through Integrations, and a cost posted here lands in the ledger you keep with the same coding. Take job cost on its own; AP, AR and the ledger stay where they are until you choose to move them.

Job cost stays in sync with

All connectors →

Pricing follows what you use. Every part of the platform can be taken on its own and kept in sync with the systems you already run. Talk to us about pricing for your company.

Talk to us →

Common questions about job cost.

FAQ.01

Is job cost a separate ledger?

No. Every transaction on the ledger carries job, phase and cost code, so job cost detail, budget vs actual and the WIP schedule read from the same postings as the trial balance. There is nothing to reconcile between them.

FAQ.02

Can I take job cost without moving my ledger?

Yes. Job cost runs on its own, in sync with the ERP you have through Integrations. Jobs and cost codes match on both sides, and postings land where they belong.

FAQ.03

How does WIP get its figures?

From job cost. Percent complete comes from cost to date against the estimate at completion, earned revenue follows from it, and over or under billing compares that with what has been billed on the job.

FAQ.04

What about materials and equipment?

Inventory covers warehouses, stock levels, receipts, issues, transfers and adjustments. The catalog holds items, rate cards and equipment. Both sit beside job cost in the same module.